Dams
have always played an important
role in harnessing Iran's
precious water reserves,
and the long-term objective
of Iran's water resources
development plan is based
on the control and regulation
of water resources through
dams.
|
|
| |
 |
|
|
The
construction of dams is
essential for an arid country
like Iran, so water can
be stored to assure the
availability of a reliable
supply to satisfy domestic,
industrial and agricultural
requirements, control floods
and generate hydroelectricity.
|
|
| |
Among
all the above mentioned water needs,
agriculture is one of the main priorities
in the national development plans in
Iran and almost has the most consumption
of water in comparison with other sectors.

There are almost 118
important rivers and 85 storage dams
in Iran, which are regulating 32 billion
m³ of water in the country. These
dams are mostly located in north, west
and south west of country.

Dams
in operation
(Total Capacity: 25 Billion
m³, Regulating Volume 32.9 Billion
m³)
There are also 82
dams under construction and 230 currently
under design process.

Dams under Construction
(Total Capacity:
30 Billion m³, Regulating Volume
18.1 Billion m³)

Dams under Design Process
 |
|
|
Narvan
Arra pioneers the utilization
of the most up to date
and advanced technology
from the Western European
design, engineering and
consultancy companies,
and has completed many
feasibility studies for
dams and hydroelectric
power plants as well
as design and engineering
of major hydromechanical
equipment for dams.
|
|
| |
 |
|
|
Based
on the requirements of
the project, we have formed
consortiums of foreign
design and engineering
companies with local steel
structure manufacturers,
such as Sadid
Industrial Group, Neyrperse, Machine
Sazi Arak, etc. to be able
to provide turn key solutions.
|
|
| |
Below are some of the major projects
we have undertaken in this field. For
further references and specific information
on each project please refer to the
project data sheets through the links
below:
Masjed-e-Soleyman Dam and HEPP Hydromechanical
Equipment Design
 |
 |
Project
Owner
|
|
Scope
of Work
|
Basic
and Detailed Design, Supervision
on Fabrication, Training
|
Partners
|
|
Completion
Date
|
1998
|
|
 |
 |
Project
Owner
|
|
Scope
of Work
|
Feasibility
Study
|
Partners
|
|
Completion
Date
|
2000
|
|
Feasibility
Study for Implementation of a re-regulation
dam downstream at the Marun Dam
 |
 |
Project
Owner
|
|
Scope
of Work
|
Feasibility
Study
|
Partners
|
|
Completion
Date
|
2001
|
|
Design and Design Review of Karkheh Dam Hydromechanical Structures
 |
 |
Project
Owner
|
|
Scope
of Work
|
Design
and Design Review
|
Partners
|
|
Completion
Date
|
1997
|
|
Design and Design
Review of Marun Dam Hydromechanical
Structures
 |
 |
Project
Owner
|
|
Scope
of Work
|
Design
and Design Review
|
Partners
|
|
Completion
Date
|
1997
|
|
|